Technical Shoots

Standard Bank Moment in Time - Dir: Adrian de sa Garces.
Entirely shot in Studio. 
Laetta - Dir: Manu Werner.
House set was built on the edge of a lake, and was built so that it could swivel in order to catch the best light.
For the Bridge scene: The bridge was a hydraulic setbuild, the road was built and tarred, and the existing road covered in greens. The boat was brought to the dam with a crane.

Lays - US, Worldwide.

Entirely a Setbuild in a Warehouse.

Overnight the entire set with all shelves, fridges, product, setbuild, had to be moved at a 90 degree angle to accommodate Lighting.

Director: Ernest Desumbila